Although I’ve taken the last two weeks off of work to spend time with Abraham, I’ve also been doing [and having done] a lot of work on the house. I’ve been working on the room that you enter from the front door. For lack of a better term, I call it the parlor. Here are some photos:
Before:
After:
Before:
After:
I painted, put down quarter-round, replaced a pane in the doors to the bedroom, and painted those too. The plaster needed some serious patching but that was done awhile ago. I’m having quite a bit of contracted work done on the bathroom and getting a closet expanded. One of the small rooms is disappearing to make this happen, but it is certainly worth it. During this process we’ve found some painted-over hand-made fixture gems. Here are some hinges:
Stripped of their paint [and original black enamel, unfortunately]:
And restored [thanks to Rustoleum]:
The window sashes have similar paint-encrusted metalwork, and I’m still working on restoring the original doorbell [you can see the paint-encrusted version and the empty spot in the photos above]. The door itself is probably going to take a week or two of work itself. I’m not looking forward on the constant removing and rehanging of it.
There will be pictures of the bathroom and closet when they are finished.